Have You Never Looked Into Cars?

“We’re going to have them fix the leaking area” He added that engineers are working out a mechanical-type joint to seal up the site. For now, the upper pond is drained and the dam is isolated from the water supply. In the lower pond is a bypass pump from the stream that typically feeds the upper pond. He said that they were able to locate this issue because the timeline for the construction project wrapped up on Monday, Nov. 9; water began running through the structure Wednesday and the odor was discovered Thursday. “That’s why we’re zeroing in on this structure as the source of the problem,”

...